# Skills tagged "Risk Register"

2 skills with this tag.

URL: https://rakenne.app/skill-tags/risk-register/index.md

- [ISO 42001 AI Risk Register](https://rakenne.app/skills/iso42001-risk-register/index.md) — Draft and validate the AI risk register for ISO/IEC 42001:2023 with ownership, treatment, and residual risk.
- [Risk Register ISO 31000](https://rakenne.app/skills/risk-register-iso31000/index.md) — Guided elaboration of an ISO 31000:2018-aligned risk register: organizational context, risk criteria (likelihood/impact scales and appetite), structured register entries with cause, existing controls, …

---

Back to [All Tags](https://rakenne.app/skill-tags/) | [Skill Library](https://rakenne.app/skills/)
