Browse Skills

ASPICE SYS.4 System Integration and Integration Test

    Get Started with This Skill

    Overview

    Elaborate ASPICE SYS.4 work products: integration strategy, integration test specification, and test results for Automotive SPICE (VDA PAM 4.0).

    Getting Started

    Add your source materials to the project workspace, then activate the ASPICE SYS.4 System Integration and Integration Test skill. The agent will guide you through the process step by step.

    Example Conversation

    You: We’re ready to plan system integration and integration tests for SYS.4. We have the system architecture and system requirements. Where do we start?

    Agent: I’ll help you define the integration strategy and integration test specification. I need: (1) Preferred integration order — e.g. bottom-up (sensors/actuators first, then ECU), or top-down; (2) Test environment — HIL, vehicle, or both; (3) Which system requirements are in scope for integration test.

    You: Bottom-up. We have a HIL bench and will do a final run in vehicle. All SYS-REQ that touch interfaces are in scope.

    Agent: I’ve created integration-strategy.md (order: radar + camera + gateway integration with ECU on HIL, then full system in vehicle) and integration-test-specification.md with test cases derived from the interface requirements. Each test case has an ID, objective, preconditions, steps, expected result, and traceability to SYS-REQ. I’ve added a results template — when you run the tests, we can fill pass/fail, date, and environment. Should I add a section for defect IDs linking to SUP.9?

    Sample Output Excerpt

    Below is a representative excerpt from a SYS.4 integration test specification and results.


    Integration test cases (excerpt)

    IDObjectivePreconditionsTraceability
    SYS-IT-001Verify ECU receives object list from radar on CANHIL: radar + ECU connected; radar sim activeSYS-REQ-006
    SYS-IT-002Verify boot time with all elements connectedFull system on HIL at −40 °CSYS-REQ-003
    SYS-IT-003Verify OTA calibration update path ECU–gatewayHIL: gateway + ECU; OTA server simSYS-REQ-001

    Integration test results (excerpt)

    Test IDDateEnvironmentResultNote
    SYS-IT-0012025-02-10HILPass
    SYS-IT-0022025-02-12HILFail2.8 s measured; defect PR-044

    Validation

    This skill does not include extension tools. Validation is performed by following the Validation checklist in the skill workflow: integration strategy covers all elements and defines order and environment; every integration test case traces to at least one system requirement or interface; test results are recorded with pass/fail and traceability; failed tests have defect or problem resolution references.

    Ready to let your expertise drive the workflow?

    Stop wrestling with rigid templates and complex tooling. Write your process in markdown, let the agent handle the rest.

    Get Started