BEP & EIR Elaborator
Get Started with This SkillOverview
Guided elaboration of BIM Execution Plan (BEP), OIR/AIR/PIR, EIR, and exchange information requirements per ISO 19650. Verifies required BEP sections and that deliverables map to project stages and responsibility matrix.
Getting Started
Add your source materials to the project workspace, then activate the BEP & EIR Elaborator skill. The agent will guide you through the process step by step.
Example Conversation
You: We’re preparing a BIM Execution Plan for a hospital project. The employer has sent an EIR. I need a responsibility matrix and deliverables mapped to project stages.
Agent: I’ll draft the BEP structure (goals, responsibility matrix, deliverables/LOD by stage) and run
check_bep_deliverablesto verify required sections exist and deliverables are linked to stages and responsibility.Agent: The tool found BEP and deliverable references but noted that deliverables should be mapped to a responsibility matrix (who delivers what). I’ve added a responsibility matrix table (role vs. deliverable) and a deliverables table with columns for Stage, Deliverable, LOD, and Responsible party. Stages align with your project phases (Concept, Design, Construction, Handover).
You: Add design stage deliverables for structural and MEP models.
Agent: Done. Re-run
check_bep_deliverablesto confirm the responsibility and stage mapping is complete.
Sample Output Excerpt
Excerpt from a BEP: responsibility matrix and deliverables by stage.
Responsibility matrix (excerpt)
| Deliverable / activity | Lead | Support | Consulted | Informed |
|---|---|---|---|---|
| Architectural model (LOD 300) | Architect | — | Structural, MEP | Employer |
| Structural model (LOD 300) | Structural engineer | — | Architect, MEP | Employer |
| EIR compliance check | BIM lead | All design leads | Employer | — |
Deliverables by project stage (excerpt)
| Stage | Deliverable | LOD | Responsible |
|---|---|---|---|
| Concept | Site and massing model | LOD 100 | Architect |
| Design | Architectural model | LOD 300 | Architect |
| Design | Structural model | LOD 300 | Structural engineer |
| Design | MEP model | LOD 300 | MEP engineer |
| Construction | As-built model | LOD 350 | Contractor |
EIR alignment: Deliverables above address Employer’s Information Requirements sections 1–4 (geometry, attributes, coordination, CDE).
Built-in Validation Tools
The skill includes an extension tool that checks the BEP for required sections and deliverable–responsibility mapping.
What the tool checks
| Check | check_bep_deliverables |
|---|---|
| Required elements | Responsibility matrix, Deliverables/LOD, Project stages/milestones, BEP identification, EIR/OIR-AIR-PIR |
| Deliverables and stages | Looks for deliverable, LOD, and stage, milestone, phase, gate |
| Responsibility | Looks for responsibility, matrix, role, RACI, who delivers |
| Findings | WARNING if a required element is missing or deliverables aren’t mapped to responsibility; INFO when present |
Example validation output
======================================================================
BEP DELIVERABLES & RESPONSIBILITY REPORT
ISO 19650-1/2
======================================================================
Document: project/bep.md
--- FINDINGS ---
[INFO] Found: Responsibility matrix.
[INFO] Found: Deliverables / LOD.
[WARNING] Deliverables should be mapped to a responsibility matrix (who delivers what). Add roles and responsibility matrix.
--- SUMMARY ---
Errors: 0
Warnings: 1
======================================================================
Run the tool on your BEP or EIR document after drafting or updating.