# CMMI-DEV Integrated Project Management

> Draft CMMI-DEV Integrated Project Management (IPM) deliverables: integrated plan, stakeholder involvement, and tailoring for ML3.



Tags: CMMI, CMMI-DEV, Process Improvement, Project Management, ML3


## Example Prompts

- Draft an integrated project management plan with tailoring for CMMI IPM
- Document stakeholder involvement and shared objectives
- Record our tailoring of organizational processes for this project

URL: https://rakenne.app/skills/cmmi-dev-integrated-project-management/index.md

Try this skill: https://rakenne.app/a/?skill=cmmi-dev-integrated-project-management



## Overview

Draft CMMI-DEV Integrated Project Management (IPM) deliverables: integrated plan, stakeholder involvement, and tailoring for ML3.

## Getting Started

Add your source materials to the project workspace, then activate the *CMMI-DEV Integrated Project Management* skill. The agent will guide you through the process step by step.

## Example Conversation

> **You:** We need an integrated project management plan for CMMI IPM that shows we tailored the org's standard processes and have stakeholder involvement. Can you draft the integrated plan summary and a tailoring record?
>
> **Agent:** I'll draft an integrated plan that references the tailored set of processes (from OPD), covers development, CM, QA, risk, and measurement in one place, and includes a stakeholder involvement section. I'll add a tailoring record: which org assets we used, what we tailored, and rationale.
>
> **You:** We dropped the formal DAR for small decisions; we use it only for make/buy and architecture. Document that.
>
> **Agent:** I've added a tailoring record entry: "DAR — applied only to decisions meeting org guidelines (make/buy, architecture). Small decisions use team consensus." The integrated plan and tailoring record are in `integrated-plan.md` and `tailoring-record.md`.

## Sample Output Excerpt

Excerpt from an Integrated Plan / Tailoring Record produced with this skill.

---

### Tailoring record

| Organizational asset | Tailoring | Rationale |
|----------------------|-----------|-----------|
| Project Planning (PP) | Used as-is; estimate model parameters set for this project size | Standard fit |
| DAR | Apply only to make/buy and architecture decisions; other decisions per team agreement | Reduce overhead for low-impact decisions |
| Verification (VER) | Peer review required for requirements and design; code review per team standard | Align with team practice |
| Measurement (MA) | Core measures: effort, schedule variance, defect density; no customer satisfaction survey this release | Focus on project control measures |

### Stakeholder involvement

- **Product Owner:** Requirements and acceptance; weekly sync; commitment at milestones.
- **Tech Lead / Architecture:** Design and technical decisions; DAR for architecture.
- **PMO:** Status report weekly; corrective action escalation per PMC.


---