# CMMI-DEV Project Monitoring and Control

> Draft CMMI-DEV Project Monitoring and Control (PMC) deliverables: monitoring data, status reports, and corrective action plans for ML2.



Tags: CMMI, CMMI-DEV, Process Improvement, Project Management, ML2


## Example Prompts

- Draft our project status report template for CMMI PMC
- Document monitoring criteria and corrective action process
- Write a corrective action plan for a schedule deviation

URL: https://rakenne.app/skills/cmmi-dev-project-monitoring-control/index.md

Try this skill: https://rakenne.app/a/?skill=cmmi-dev-project-monitoring-control



## Overview

Draft CMMI-DEV Project Monitoring and Control (PMC) deliverables: monitoring data, status reports, and corrective action plans for ML2.

## Getting Started

Add your source materials to the project workspace, then activate the *CMMI-DEV Project Monitoring and Control* skill. The agent will guide you through the process step by step.

## Example Conversation

> **You:** We need a project status report template and a short description of our corrective action process for CMMI PMC. We report weekly to management.
>
> **Agent:** I'll create a status report template (progress vs plan, accomplishments, next period, risks/issues, corrective actions) and a one-page corrective action process: how we identify significant deviations, document actions, assign owners, and track to closure. I'll align both to CMMI PMC specific practices.
>
> **You:** Our threshold for corrective action is >10% schedule slip or >5% effort variance.
>
> **Agent:** I've added that to the "Monitoring criteria" section and linked it to when we open a corrective action record. The status report template includes a placeholder for "Corrective actions in progress" and "Decisions needed."

## Sample Output Excerpt

Excerpt from a Project Status Report template produced with this skill.

---

### Project Status Report — [Project name] — Week of [date]

**Progress vs plan**

| Parameter | Plan | Actual | Variance | Status |
|-----------|------|--------|----------|--------|
| Schedule (milestones) | … | … | … | Green / Yellow / Red |
| Effort (to date) | … | … | … | … |
| Scope (deliverables) | … | … | … | … |

**Accomplishments this period:** …

**Planned next period:** …

**Risks and issues:** …

**Corrective actions in progress:** (e.g. CAP-001: Schedule recovery — owner, due date, status)

**Decisions needed:** …


---

Back to [Skill Library](https://rakenne.app/skills/index.md)
