# CMMI-DEV Supplier Agreement Management

> Draft CMMI-DEV Supplier Agreement Management (SAM) deliverables: supplier agreements, SOWs, and acceptance criteria for ML2.



Tags: CMMI, CMMI-DEV, Process Improvement, Supplier Management, ML2


## Example Prompts

- Draft a supplier agreement and SOW for our vendor
- Define acceptance criteria and acceptance process for SAM
- Document our supplier agreement management process for CMMI

URL: https://rakenne.app/skills/cmmi-dev-supplier-agreement-management/index.md

Try this skill: https://rakenne.app/a/?skill=cmmi-dev-supplier-agreement-management



## Overview

Draft CMMI-DEV Supplier Agreement Management (SAM) deliverables: supplier agreements, SOWs, and acceptance criteria for ML2.

## Getting Started

Add your source materials to the project workspace, then activate the *CMMI-DEV Supplier Agreement Management* skill. The agent will guide you through the process step by step.

## Example Conversation

> **You:** We're outsourcing our mobile app development and need a SOW and acceptance criteria for CMMI SAM. Deliverables are: app (iOS/Android), source code, and 1 year of bug fixes. Can you draft the SOW and acceptance process?
>
> **Agent:** I'll draft a Statement of Work: scope (deliverables, platforms), schedule and milestones, acceptance criteria per deliverable, review and acceptance process, and change control. I'll align with CMMI SAM (agreement content, acceptance, oversight).
>
> **You:** Acceptance for the app should be: feature sign-off + no critical bugs + performance criteria.
>
> **Agent:** I've defined acceptance criteria: (1) Feature sign-off against requirements checklist; (2) No open critical/high defects; (3) Performance (e.g. launch time, frame rate) per agreed thresholds. The SOW and acceptance checklist are in `supplier-sow.md` and `acceptance-criteria.md`.

## Sample Output Excerpt

Excerpt from a Supplier SOW produced with this skill.

---

### Deliverables and acceptance criteria

| Deliverable | Acceptance criteria | Verification method |
|-------------|---------------------|---------------------|
| Mobile app (iOS, Android) | Feature completeness per requirements checklist; no critical/high defects; performance targets met | Demo + test report + performance run |
| Source code | Handover in agreed repo; build instructions; license as agreed | Review + build verification |
| Bug-fix period (12 months) | Response and fix per SLA (e.g. critical 5 days) | Tracking in shared defect system |

**Acceptance process:** Formal acceptance review at milestone; sign-off by project manager; nonconforming work documented and re-submitted per agreement.


---

Back to [Skill Library](https://rakenne.app/skills/index.md)
